GAP ROAD over I-82
4.6 E YAKIMA CO LN · County 005, Washington · Built 1978 · 2 Lanes · 6,869 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
46.222228, -119.790747
This bridge is in worse condition than 93.4% of bridges in County 005. The average bridge in Washington is 0 years old; this one is 48 years old.
Nearby Bridges
JOHNSON RD over I-82
Built 1980
OLD INLAND EMPIRE over I-82
Built 1978
WINE COUNTRY ROAD over YAKIMA RIVER
Built 2005
GAP ROAD over SVID CANAL
Built 1976
WINE COUNTRY ROAD over YAKIMA RIVER
Built 1931
GRANT AVE over YAKIMA RIVER
Built 1986
MISSIMER ROAD over SVID CANAL
Built 1975
I-82 over SUNNYSIDE CANAL
Built 1980
I-82 over SUNNYSIDE CANAL
Built 1980
COUNTY RT 12 over SVID CANAL
Built 1930
Bridge Details
- Structure #
- 0010534B0000000
- Year Built
- 1978
- Length
- 64 m (210 ft)
- Max Span
- 30.8 m
- Width
- 17.7 m (58.1 ft)
- Lanes
- 2
- Daily Traffic
- 6,869
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,843,000
- Total Project Cost
- $5,686,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.