I-90 over S FK SNOQUALMIE RIVER
1.3 E JCT SR 202 · County 033, Washington · Built 1975 · 3 Lanes · 24,954 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.47345, -121.778992
This bridge is in worse condition than 12.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 51 years old.
Nearby Bridges
I-90 over S FK SNOQUALMIE RIVER
Built 1975
I-90 over 424TH AVE SE
Built 1976
I-90 over 424TH AVE SE
Built 1976
436TH AVE SE over I-90
Built 1976
436TH AVE SE over S FK SNOQUALMIE
Built 1971
SW MT SI BLVD over RIBARY CREEK
Built 1989
SE MT. SI RD over MF SNOQUALMIE R
Built 2008
I-90 over SR 202
Built 1975
I-90 over SR 202
Built 1976
SR 202 over S FK SNOQUALMIE RIVER
Built 1976
Bridge Details
- Structure #
- 0009814A0000000
- Year Built
- 1975
- Length
- 147.5 m (483.9 ft)
- Max Span
- 44.2 m
- Width
- 16.8 m (55.1 ft)
- Lanes
- 3
- Daily Traffic
- 24,954
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,208,000
- Total Project Cost
- $12,415,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.