I-90 over HIGH POINT RD
4.4 E JCT SR 900 · County 033, Washington · Built 1975 · 4 Lanes · 33,894 vehicles/day
Overall
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
47.531517, -121.980025
This bridge is in worse condition than 48.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 51 years old.
Nearby Bridges
I-90 over HIGH POINT RD
Built 1975
I-90 over E FK ISSAQUAH CREEK
Built 1976
I-90 over E FK ISSAQUAH CREEK
Built 1976
I-90 over E FK ISSAQUAH CREEK
Built 1976
I-90 over E FK ISSAQUAH CREEK
Built 1976
I-90 over E FK ISSAQUAH CREEK
Built 1976
I-90 over E FK ISSAQUAH CR
Built 1975
I-90 over E FK ISSAQUAH CR
Built 1976
I-90 over E FK ISSAQUAH CR
Built 1951
I-90 over E FK ISSAQUAH CR
Built 1976
Bridge Details
- Structure #
- 0009733A0000000
- Year Built
- 1975
- Length
- 42.7 m (140.1 ft)
- Max Span
- 41.1 m
- Width
- 21.6 m (70.9 ft)
- Lanes
- 4
- Daily Traffic
- 33,894
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,328,000
- Total Project Cost
- $4,655,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.