I-90 over HIGH POINT RD

4.4 E JCT SR 900 · County 033, Washington · Built 1975 · 4 Lanes · 33,894 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
0009733A0000000
Year Built
1975
Length
42.7 m (140.1 ft)
Max Span
41.1 m
Width
21.6 m (70.9 ft)
Lanes
4
Daily Traffic
33,894
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,328,000
Total Project Cost
$4,655,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.