SR 16 over TYLER ST - SNAKE LAKE

1.6 N JCT I-5 · County 053, Washington · Built 1972 · 4 Lanes · 59,613 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0009415A0000000
Year Built
1972
Reconstructed
2006
Length
147.2 m (482.9 ft)
Max Span
42.1 m
Width
26.8 m (87.9 ft)
Lanes
4
Daily Traffic
59,613
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,030,000
Total Project Cost
$16,060,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.