NE 78TH ST over I-205

1.7 N JCT SR 500 · County 011, Washington · Built 1973 · 2 Lanes · 7,616 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0009241C0000000
Year Built
1973
Length
130.8 m (429.1 ft)
Max Span
35.1 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
7,616
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,687,000
Total Project Cost
$9,374,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.