WERNER/LOXIE EAGAN over SR 3

0.7 N JCT SR 304 · County 035, Washington · Built 1972 · 4 Lanes · 13,643 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0009203A0000000
Year Built
1972
Length
64.9 m (212.9 ft)
Max Span
32.9 m
Width
18.8 m (61.7 ft)
Lanes
4
Daily Traffic
13,643
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,530,000
Total Project Cost
$5,059,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.