SR 20 over GRANITE CREEK

2.5 E WHATCOM CO · County 057, Washington · Built 1971 · 2 Lanes · 1,120 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 7 Good
Substructure 7 Good

Location

48.625889, -120.841297

This bridge is in worse condition than 8.6% of bridges in County 057. The average bridge in Washington is 0 years old; this one is 55 years old.

Nearby Bridges

Bridge Details

Structure #
0008963C0000000
Year Built
1971
Length
61 m (200.1 ft)
Max Span
30.5 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
1,120
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,710,000
Total Project Cost
$3,420,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.