SR 20 over GRANITE CREEK
2.5 E WHATCOM CO · County 057, Washington · Built 1971 · 2 Lanes · 1,120 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
48.625889, -120.841297
This bridge is in worse condition than 8.6% of bridges in County 057. The average bridge in Washington is 0 years old; this one is 55 years old.
Bridge Details
- Structure #
- 0008963C0000000
- Year Built
- 1971
- Length
- 61 m (200.1 ft)
- Max Span
- 30.5 m
- Width
- 10.8 m (35.4 ft)
- Lanes
- 2
- Daily Traffic
- 1,120
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,710,000
- Total Project Cost
- $3,420,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.