I-5 over BN RY

4.9 N JCT SR 503 · County 015, Washington · Built 1972 · 3 Lanes · 37,599 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 7 Good
Substructure 7 Good

Location

45.959431, -122.805928

This bridge is in worse condition than 52.8% of bridges in County 015. The average bridge in Washington is 0 years old; this one is 54 years old.

Nearby Bridges

Bridge Details

Structure #
0008952D0000000
Year Built
1972
Length
117 m (383.9 ft)
Max Span
57.9 m
Width
16.6 m (54.5 ft)
Lanes
3
Daily Traffic
37,599
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,925,000
Total Project Cost
$9,850,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.