I-90 over 468TH AVE SE
4.4 E JCT SR 202 · County 033, Washington · Built 1971 · 3 Lanes · 18,090 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
47.465542, -121.716117
This bridge is in worse condition than 12.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 55 years old.
Nearby Bridges
I-90 over 468TH AVE SE
Built 1971
468TH AVE SE over S FK SNOQUALMIE RIVER
Built 2004
SE LAKE DOROTHY RD over SLIDE DEPRESSION
Built 2011
I-90 over BNRR (REMOVED)
Built 1976
I-90 over BNRR (REMOVED)
Built 1976
I-90 over S FK SNOQUALMIE R
Built 1974
436TH AVE SE over S FK SNOQUALMIE
Built 1971
436TH AVE SE over I-90
Built 1976
SE MT. SI RD over MF SNOQUALMIE R
Built 2008
I-90 over S FK SNOQUALMIE RIVER
Built 1971
Bridge Details
- Structure #
- 0008914A0000000
- Year Built
- 1971
- Length
- 53.3 m (174.9 ft)
- Max Span
- 23.2 m
- Width
- 16.6 m (54.5 ft)
- Lanes
- 3
- Daily Traffic
- 18,090
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,244,000
- Total Project Cost
- $4,489,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.