SR 6 over CHEHALIS RIVER

21.9 E PACIFIC CO · County 041, Washington · Built 1971 · 2 Lanes · 7,228 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0008757A0000000
Year Built
1971
Length
123.7 m (405.8 ft)
Max Span
61 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
7,228
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,050,000
Total Project Cost
$8,100,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.