SR 28 over CRAB CREEK

13.2 E JCT SR 17 · County 025, Washington · Built 1969 · 2 Lanes · 622 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0008639A0000000
Year Built
1969
Length
67.1 m (220.1 ft)
Max Span
32.9 m
Width
12 m (39.4 ft)
Lanes
2
Daily Traffic
622
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,090,000
Total Project Cost
$4,180,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.