I-182 over N 20TH AVE

6.8 E BENTON CO · County 021, Washington · Built 1968 · 2 Lanes · 19,854 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 6 Satisfactory
Substructure 7 Good

Location

46.248806, -119.117361

This bridge is in worse condition than 56.4% of bridges in County 021. The average bridge in Washington is 0 years old; this one is 58 years old.

Nearby Bridges

Bridge Details

Structure #
0008422B0000000
Year Built
1968
Length
49.1 m (161.1 ft)
Max Span
23.5 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
19,854
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,530,000
Total Project Cost
$3,059,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.