I-90 over DRY RELIEF

10.1 E JCT I-82 · County 037, Washington · Built 1968 · 2 Lanes · 8,811 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0008377B0000000
Year Built
1968
Length
69.2 m (227 ft)
Max Span
34.1 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
8,811
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,264,000
Total Project Cost
$4,529,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.