SCOTT PAPER CO RD over SR 20
10.8 E JCT SR 9 · County 057, Washington · Built 1967 · 1 Lanes · 75 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
48.530344, -122.000097
This bridge is in worse condition than 97.7% of bridges in County 057. The average bridge in Washington is 0 years old; this one is 59 years old.
Nearby Bridges
SR 20 over MUDDY CR
Built 1967
FRONTAGE ROAD over MUDDY CREEK
Built 1967
HAMILTON CEMETERY over MUDDY CREEK
Built 1965
LYMAN HAMILTON HWY over MUDDY CREEK
Built 1955
SOUTH SKAGIT HWY over CUMBERLAND CREEK
Built 1961
LYMAN HAMILTON HWY over RED CABIN CREEK
Built 1954
SR 20 over RED CABIN CREEK
Built 2011
SR 20 over E FK RED CABIN CR
Built 1966
SOUTH SKAGIT HWY over DAVIS SLOUGH
Built 2014
ROAD over CUMBERLAND CREEK
Built 1966
Bridge Details
- Structure #
- 0008227A0000000
- Year Built
- 1967
- Length
- 55.2 m (181.1 ft)
- Max Span
- 12.5 m
- Width
- 4.7 m (15.4 ft)
- Lanes
- 1
- Daily Traffic
- 75
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $774,000
- Total Project Cost
- $1,548,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.