I-90 over CANYON RD & BNSF RR

3.3 E JCT US 97 · County 037, Washington · Built 1968 · 3 Lanes · 15,658 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0008200G0000000
Year Built
1968
Length
139 m (456 ft)
Max Span
35.4 m
Width
14.8 m (48.6 ft)
Lanes
3
Daily Traffic
15,658
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,090,000
Total Project Cost
$10,180,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.