US 97 over METHOW RIVER

0.1 N JCT SR 153 · County 047, Washington · Built 1966 · 2 Lanes · 5,564 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
0007881A0000000
Year Built
1966
Length
142.6 m (467.8 ft)
Max Span
31.7 m
Width
10.2 m (33.5 ft)
Lanes
2
Daily Traffic
5,564
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,002,000
Total Project Cost
$8,003,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.