I-405 over SR 900 / N PARK DR
JCT SR 900 · County 033, Washington · Built 1966 · 3 Lanes · 65,721 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.490489, -122.191997
This bridge is in worse condition than 48.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 60 years old.
Nearby Bridges
I-405 over SUNSET BLVD (OLD SR 900)
Built 1963
I-405 over SR 900 / N PARK DR
Built 1966
I-405 over NE 3RD ST
Built 1993
I-405 over SR 169
Built 1994
ABERDEEN AVE NE over SR 900
Built 1967
BRONSON WAY N over CEDAR R
Built 1940
I-405 over CEDAR RIVER
Built 1994
I-405 over CEDAR RIVER
Built 1993
HOUSER WAY over CEDAR RIVER
Built 1960
WELLS AVENUE over CEDAR RIVER
Built 1987
Bridge Details
- Structure #
- 0007828B0000000
- Year Built
- 1966
- Length
- 65.5 m (214.9 ft)
- Max Span
- 32 m
- Width
- 12.3 m (40.4 ft)
- Lanes
- 3
- Daily Traffic
- 65,721
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,349,000
- Total Project Cost
- $4,698,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.