US 12 over SATSOP R OVERFLOW

4.8 E JCT SR 107 · County 027, Washington · Built 1965 · 2 Lanes · 11,589 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0007612A0000000
Year Built
1965
Length
78.9 m (258.9 ft)
Max Span
14.3 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
11,589
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,460,000
Total Project Cost
$4,921,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.