US 12 over RAINEY CREEK OVERFLOW

10.4 E JCT SR 7 · County 041, Washington · Built 1964 · 2 Lanes · 4,795 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
0007463A0000000
Year Built
1964
Length
19.8 m (65 ft)
Max Span
7.6 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
4,795
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$618,000
Total Project Cost
$1,235,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.