US 97 over SR 155

0.2 N JCT SR 155 · County 047, Washington · Built 1964 · 2 Lanes · 8,828 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0007309B0000000
Year Built
1964
Length
17.7 m (58.1 ft)
Max Span
16.6 m
Width
12.7 m (41.7 ft)
Lanes
2
Daily Traffic
8,828
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$580,000
Total Project Cost
$1,161,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.