SR 523 / NE 145TH over I-5

0.9 E JCT SR 99 · County 033, Washington · Built 1964 · 5 Lanes · 26,758 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

47.734047, -122.324717

This bridge is in worse condition than 12.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 62 years old.

Nearby Bridges

Bridge Details

Structure #
0007270E0000000
Year Built
1964
Length
75.9 m (249 ft)
Max Span
22.9 m
Width
21.9 m (71.9 ft)
Lanes
5
Daily Traffic
26,758
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,666,000
Total Project Cost
$7,333,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.