US 395 over COLVILLE R

3.6 N JCT SR 231 · County 065, Washington · Built 1963 · 2 Lanes · 8,606 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0007113A0000000
Year Built
1963
Reconstructed
1994
Length
33.5 m (109.9 ft)
Max Span
13 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
8,606
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,124,000
Total Project Cost
$2,247,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.