I-5 NBCD over SR 104

3.1 N JCT SR 523 · County 033, Washington · Built 1963 · 2 Lanes · 7,260 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 6 Satisfactory
Substructure 7 Good

Location

47.777597, -122.317633

This bridge is in worse condition than 48.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 63 years old.

Nearby Bridges

Bridge Details

Structure #
0007071C0000000
Year Built
1963
Reconstructed
1995
Length
62.8 m (206 ft)
Max Span
32.9 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
7,260
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,152,000
Total Project Cost
$4,305,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.