MITCHELL AVE over I-5

0.4 N JCT SR 543 · County 073, Washington · Built 1963 · 2 Lanes · 5,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

48.990767, -122.741656

This bridge is in worse condition than 11.5% of bridges in County 073. The average bridge in Washington is 0 years old; this one is 63 years old.

Nearby Bridges

Bridge Details

Structure #
0006851A0000000
Year Built
1963
Length
92.4 m (303.1 ft)
Max Span
28.3 m
Width
11.3 m (37.1 ft)
Lanes
2
Daily Traffic
5,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,697,000
Total Project Cost
$3,394,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.