I-5 over SR 516

7.2 N JCT SR 18 · County 033, Washington · Built 1962 · 5 Lanes · 104,261 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

47.391667, -122.290753

This bridge is in worse condition than 48.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 64 years old.

Nearby Bridges

Bridge Details

Structure #
0006820B0000000
Year Built
1962
Reconstructed
2022
Length
78.9 m (258.9 ft)
Max Span
21.3 m
Width
29 m (95.1 ft)
Lanes
5
Daily Traffic
104,261
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,782,000
Total Project Cost
$11,564,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.