TERRACE HTS/YAKIMA over I-82

1.9 E JCT US 12 · County 077, Washington · Built 1962 · 6 Lanes · 23,453 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
0006744A0000000
Year Built
1962
Reconstructed
1996
Length
78.3 m (256.9 ft)
Max Span
21.9 m
Width
27.3 m (89.6 ft)
Lanes
6
Daily Traffic
23,453
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,761,000
Total Project Cost
$9,522,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.