SR 506 over CAMPBELL CREEK

0.9 E JCT SECOND ST · County 015, Washington · Built 1960 · 2 Lanes · 541 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0006575A0000000
Year Built
1960
Length
23.3 m (76.4 ft)
Max Span
9.1 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
541
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$544,000
Total Project Cost
$1,087,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.