SR 530 over SAUK RIVER

3.5 N SNOHOMISH CO · County 057, Washington · Built 1958 · 2 Lanes · 1,475 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
0006038A0000000
Year Built
1958
Length
152.7 m (501 ft)
Max Span
67.1 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
1,475
Material
Steel
Design
Truss - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,570,000
Total Project Cost
$7,139,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.