SR 9 over BATEY SLOUGH

5.5 N JCT SR 538 · County 057, Washington · Built 1959 · 2 Lanes · 11,660 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0006000B0000000
Year Built
1959
Length
55.5 m (182.1 ft)
Max Span
7.3 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
11,660
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,902,000
Total Project Cost
$3,804,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.