US 2 over NP RY

0.3 E JCT SR 25 · County 043, Washington · Built 1958 · 2 Lanes · 5,589 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0005802B0000000
Year Built
1958
Length
74.1 m (243.1 ft)
Max Span
29.3 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
5,589
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,424,000
Total Project Cost
$4,848,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.