I-90 over SR 261
1.5 E JCT US 395 · County 001, Washington · Built 1952 · 2 Lanes · 8,405 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
47.116922, -118.365633
This bridge is in worse condition than 73.8% of bridges in County 001. The average bridge in Washington is 0 years old; this one is 74 years old.
Nearby Bridges
I-90 over SR 261
Built 1958
WELLSANDT RD over I-90
Built 1958
I-90 over US 395 SB
Built 1995
I-90 over US 395 SB
Built 1996
CHELAN STREET over PAHA DRAINAGE DITCH
Built 1987
DIVISION STREET over PAHA DRAINAGE DITCH
Built 1930
US 395 RAMP over I-90
Built 1958
E-NS RAMP I-90 over BURLINGTON-NORTHERN RR
Built 1985
BAUMAN RD. over INTERMITTENT STREAM
Built 1900
US 395 NB over N-N RAMP
Built 1996
Bridge Details
- Structure #
- 0005761B0000000
- Year Built
- 1952
- Length
- 51.5 m (169 ft)
- Max Span
- 20.1 m
- Width
- 10.6 m (34.8 ft)
- Lanes
- 2
- Daily Traffic
- 8,405
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,686,000
- Total Project Cost
- $3,372,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.