SR 99 over SPOKANE ST
2.1 N JCT SR 509 · County 033, Washington · Built 1959 · 4 Lanes · 18,505 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
47.571403, -122.339342
This bridge is in worse condition than 48.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 67 years old.
Nearby Bridges
E-N RAMP over CITY STREET NPRR
Built 1959
SW SPOKANE ST over E MARGINAL WAY S
Built 1983
SW SPOKANE ST over E MARGINAL WAY S
Built 1983
Spokane Street over Spokane Street
Built 2012
1st Avenue ramp over S Spokane St
Built 2014
SW SPOKANE ST over W WATERWAY OF DUWAMISH
Built 1991
S SPOKANE ST over E MARGINAL WY 1ST 4TH
Built 1941
Spokane St Viaduct over E MARGINAL WY 1ST 4TH
Built 2012
SW SPOKANE ST over DELRIDGE WAY SW
Built 1983
SPOKANE ST EB LANE over I-5
Built 1966
Bridge Details
- Structure #
- 0005758A0000000
- Year Built
- 1959
- Reconstructed
- 2013
- Length
- 851 m (2792 ft)
- Max Span
- 41.1 m
- Width
- 25.6 m (84 ft)
- Lanes
- 4
- Daily Traffic
- 18,505
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $53,048,000
- Total Project Cost
- $106,096,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.