I-5 over MEADOR AVE

2.8 N JCT SR 11 · County 073, Washington · Built 1957 · 2 Lanes · 38,169 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 7 Good

Location

48.752894, -122.462842

This bridge is in worse condition than 47.6% of bridges in County 073. The average bridge in Washington is 0 years old; this one is 69 years old.

Nearby Bridges

Bridge Details

Structure #
0005463A0000000
Year Built
1957
Length
85.3 m (279.9 ft)
Max Span
23.5 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
38,169
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,926,000
Total Project Cost
$5,852,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.