S-PLUM RAMP over EASTSIDE ST SE

1.2 N JCT US 101 · County 067, Washington · Built 1957 · 1 Lanes · 5,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0005296B0000000
Year Built
1957
Length
22.3 m (73.2 ft)
Max Span
21.3 m
Width
7.7 m (25.3 ft)
Lanes
1
Daily Traffic
5,800
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$486,000
Total Project Cost
$971,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.