I-5 over CAPITOL LAKE

0.5 N JCT US 101 · County 067, Washington · Built 1956 · 11 Lanes · 49,410 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0005090A0000000
Year Built
1956
Reconstructed
1986
Length
119.5 m (392.1 ft)
Max Span
33.5 m
Width
64 m (210 ft)
Lanes
11
Daily Traffic
49,410
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,100,000
Total Project Cost
$16,199,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.