SR 14 over QUARRY RD
3.5 E JCT I-205 · County 011, Washington · Built 1957 · 6 Lanes · 28,694 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
45.587381, -122.485781
This bridge is in worse condition than 55.3% of bridges in County 011. The average bridge in Washington is 0 years old; this one is 69 years old.
Nearby Bridges
192ND AVE over SR 14
Built 2002
SR 14 over 164TH AVE
Built 1996
NE 158TH AVE over B-024 X COLUMBIA SLOUGH
Built 2000
NE AIRPORT WAY over B-137 X COLUMBIA SLOUGH
Built 1992
NE AIRPORT WAY over B-136 X COLUMBIA SLOUGH
Built 1992
NE 148TH AVE over B-023 x COLUMBIA SLOUGH
Built 2000
NE 138TH AVE over B-086 X COLUMBIA SLOUGH
Built 2000
185TH AVE over SLOUGH
Built 1992
AIRPORT WAY over PACIFIC RAILROAD
Built 1992
2C TO HIST COL HWY over UPRR
Built 1992
Bridge Details
- Structure #
- 0005044A0000000
- Year Built
- 1957
- Reconstructed
- 2002
- Length
- 8.5 m (27.9 ft)
- Max Span
- 7.9 m
- Width
- 33.4 m (109.6 ft)
- Lanes
- 6
- Daily Traffic
- 28,694
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $718,000
- Total Project Cost
- $1,436,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.