US 101 over CHEHALIS RIVER

0.2 N JCT SR 105 · County 027, Washington · Built 1955 · 4 Lanes · 26,216 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
0004386A0000000
Year Built
1955
Length
804.1 m (2638.1 ft)
Max Span
103.6 m
Width
20.4 m (66.9 ft)
Lanes
4
Daily Traffic
26,216
Material
Steel
Design
Movable - Bascule
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$31,326,000
Total Project Cost
$62,652,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.