I-5 over NEWAUKUM RIVER

1.2 N JCT SR 508 · County 041, Washington · Built 1952 · 2 Lanes · 29,186 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 7 Good

Location

46.598336, -122.902272

This bridge is in worse condition than 50.7% of bridges in County 041. The average bridge in Washington is 0 years old; this one is 74 years old.

Nearby Bridges

Bridge Details

Structure #
0004204B0000000
Year Built
1952
Reconstructed
1976
Length
86.6 m (284.1 ft)
Max Span
27.4 m
Width
12 m (39.4 ft)
Lanes
2
Daily Traffic
29,186
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,563,000
Total Project Cost
$5,126,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.