US 97 over OKANOGAN RIVER
15.6 N JCT SR 20 · County 047, Washington · Built 1951 · 2 Lanes · 3,349 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
48.921239, -119.421286
This bridge is in worse condition than 49.1% of bridges in County 047. The average bridge in Washington is 0 years old; this one is 75 years old.
Bridge Details
- Structure #
- 0003897A0000000
- Year Built
- 1951
- Length
- 116.4 m (381.9 ft)
- Max Span
- 21.3 m
- Width
- 10.2 m (33.5 ft)
- Lanes
- 2
- Daily Traffic
- 3,349
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,084,000
- Total Project Cost
- $6,169,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.