SR 215 over SALMON CR

0.6 N JCT SR 20 · County 047, Washington · Built 1950 · 3 Lanes · 5,294 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
0003718A0000000
Year Built
1950
Length
18 m (59.1 ft)
Max Span
6.4 m
Width
24.1 m (79.1 ft)
Lanes
3
Daily Traffic
5,294
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$869,000
Total Project Cost
$1,738,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.