SR 542 over RAZORHONE CREEK

29.2 E JCT SR 547 · County 073, Washington · Built 1945 · 2 Lanes · 623 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

48.859131, -121.659922

This bridge is in worse condition than 11.5% of bridges in County 073. The average bridge in Washington is 0 years old; this one is 81 years old.

Nearby Bridges

Bridge Details

Structure #
0003017D0000000
Year Built
1945
Length
7.6 m (24.9 ft)
Max Span
6.9 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
623
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$190,000
Total Project Cost
$380,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.