US 97 over KUSSHI CR
19.6 N JCT SR 142 · County 039, Washington · Built 1945 · 2 Lanes · 4,013 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
3
Serious
Superstructure
4
Poor
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 3 | Serious |
| Superstructure | 4 | Poor |
| Substructure | 4 | Poor |
Location
46.036972, -120.586786
This bridge is in worse condition than 96.7% of bridges in County 039. The average bridge in Washington is 0 years old; this one is 81 years old.
Bridge Details
- Structure #
- 0003015A0000000
- Year Built
- 1945
- Length
- 18.3 m (60 ft)
- Max Span
- 10.1 m
- Width
- 9.4 m (30.8 ft)
- Lanes
- 2
- Daily Traffic
- 4,013
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $527,000
- Total Project Cost
- $1,054,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.