US 97 over KUSSHI CR

19.6 N JCT SR 142 · County 039, Washington · Built 1945 · 2 Lanes · 4,013 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
3
Serious
Superstructure
4
Poor
Substructure
4
Poor

Condition Ratings

ComponentRatingDescription
Deck 3 Serious
Superstructure 4 Poor
Substructure 4 Poor

Location

46.036972, -120.586786

This bridge is in worse condition than 96.7% of bridges in County 039. The average bridge in Washington is 0 years old; this one is 81 years old.

Nearby Bridges

Bridge Details

Structure #
0003015A0000000
Year Built
1945
Length
18.3 m (60 ft)
Max Span
10.1 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
4,013
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$527,000
Total Project Cost
$1,054,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.