US 2 over S FORK SKYKOMISH RIVER

10.3 E SNOHOMISH CO · County 033, Washington · Built 1940 · 2 Lanes · 5,782 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 6 Satisfactory
Substructure 5 Fair

Location

47.712094, -121.312689

This bridge is in worse condition than 83.7% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 86 years old.

Nearby Bridges

Bridge Details

Structure #
0002561B0000000
Year Built
1940
Length
79.2 m (259.8 ft)
Max Span
27.4 m
Width
9 m (29.5 ft)
Lanes
2
Daily Traffic
5,782
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,976,000
Total Project Cost
$3,952,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.