SR 153 over METHOW RIVER

14.0 N JCT US 97 · County 047, Washington · Built 1939 · 2 Lanes · 1,847 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
3
Serious
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
0002450C0000000
Year Built
1939
Length
106.7 m (350.1 ft)
Max Span
23.5 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
1,847
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,494,000
Total Project Cost
$4,988,000