US 12 over MILL CREEK

12.5 E JCT I-5 · County 041, Washington · Built 1938 · 2 Lanes · 7,862 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
0002328A0000000
Year Built
1938
Reconstructed
1971
Length
48.8 m (160.1 ft)
Max Span
27.4 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
7,862
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,596,000
Total Project Cost
$3,192,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.