SR 27 over PALOUSE RIVER

14.8 N JCT SR 270 · County 075, Washington · Built 1938 · 2 Lanes · 3,048 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
0002309A0000000
Year Built
1938
Length
39.5 m (129.6 ft)
Max Span
29.1 m
Width
11.5 m (37.7 ft)
Lanes
2
Daily Traffic
3,048
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$922,000
Total Project Cost
$1,845,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.