SR 22 over SLOUGH OF YAKIMA R
0.7 E JCT I-82 · County 077, Washington · Built 1935 · 2 Lanes · 9,615 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
46.422842, -120.314167
This bridge is in worse condition than 58.9% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 91 years old.
Nearby Bridges
SR 22 over I-82
Built 1980
SR 22 over BEAVER CRK
Built 1979
I-82 over CANAL
Built 1980
SR 22 over YAKIMA R
Built 1935
HIGHLAND DR. over SVID CANAL
Built 2004
WHITE ROAD over SVID CANAL
Built 2003
KNIGHT HILL RD. over SVID CANAL
Built 2000
CHEYNE RD. over SVID CANAL
Built 2001
N MEYERS RD over I-82
Built 1980
MEYERS RD. N. over YAKIMA RIVER
Built 2017
Bridge Details
- Structure #
- 0001942A0000000
- Year Built
- 1935
- Length
- 35.1 m (115.2 ft)
- Max Span
- 14.3 m
- Width
- 9.3 m (30.5 ft)
- Lanes
- 2
- Daily Traffic
- 9,615
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $820,000
- Total Project Cost
- $1,639,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.