US 101 over HOQUIAM RIVER

3.3 N JCT US 12 · County 027, Washington · Built 1928 · 2 Lanes · 12,765 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
0001084A0000000
Year Built
1928
Reconstructed
1948
Length
603.5 m (1980 ft)
Max Span
61 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
12,765
Material
Steel
Design
Movable - Bascule
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$17,399,000
Total Project Cost
$34,798,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.