US 101 over HAMMA HAMMA RIVER

5.1 S JEFFERSON CO · County 045, Washington · Built 1924 · 2 Lanes · 2,911 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
0000734A0000000
Year Built
1924
Length
46.6 m (152.9 ft)
Max Span
45.7 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
2,911
Material
Concrete
Design
Arch - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,163,000
Total Project Cost
$2,326,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.