SR 3 over MILL CREEK

0.9 N JCT US 101 · County 045, Washington · Built 1921 · 2 Lanes · 15,354 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
0000451A0000000
Year Built
1921
Reconstructed
1966
Length
39.3 m (128.9 ft)
Max Span
24.7 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
15,354
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,042,000
Total Project Cost
$2,083,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.